The line through Truckee is the original transcontinental crossing of the Sierra,
rebuilt repeatedly while in service. A dated record; who did the building is
its own page.
1869
The golden spike at Promontory joins the Central Pacific and Union Pacific on May 10.
Donner Pass carries the first transcontinental railroad over the Sierra, and rail
traffic between Northern California and the East passes through Truckee.
Golden Spike National Historical Park
1860s–70s
To run through the Sierra winter, the railroad roofs the mountain track with wooden
snowsheds, eventually covering tens of miles. The sheds, rebuilt repeatedly after fires
and storms, made year-round operation over the pass possible.
Donner Summit Historical Society, Heirloom archives
1873–1943
From 1873 the Truckee Lumber Company ran logging lines west of town on narrow-gauge
track, narrower than the main line; its mill closed in 1909. The Sierra Nevada Wood and
Lumber Company opened Hobart Mills in 1897 and laid more than 75 miles of narrow-gauge
track, closing in 1936-37. The Boca and Loyalton Railroad ran north from Boca from 1901;
accounts of its end differ between 1916 and 1918. A 16-mile line to Tahoe City ran from
1900 to 1943; its roadbed is the bike path beside State Route 89.
Pacific Narrow Gauge, Truckee Lumber Co. ·
TDHS, Hobart Mills ·
Sierra Sun, Boca & Loyalton ·
Lake Tahoe Railway ·
the bike path marker
1901–10
Under Southern Pacific, surveys for a long summit tunnel and for electrification are
studied and shelved. From 1910 the mountain's work goes to cab-forward steam locomotives,
built with the cab in front so crews would not suffocate in the snowsheds.
PSRHS timeline
1925
A second track over the summit opens, carried through the two-mile Tunnel 41 under Mount
Judah. The mountain now runs as a double-track railroad: the 1868 line over the top, the
1925 line through the mountain.
Tunnel 41 ·
PSRHS timeline
1958
Steam ends on Donner. The last cab-forward crossed in 1957, the final steam excursion
in October 1958; diesels have run the pass ever since.
The sole surviving cab-forward stands in the California State Railroad Museum.
California State Railroad Museum
(archived) ·
PSRHS timeline
1983
Amtrak's train over Donner, until then the San Francisco Zephyr, is renamed the
California Zephyr when its mid-route alignment shifts to Colorado; the Donner crossing
itself has hosted passenger trains continuously since 1868. The Zephyr still stops in
Truckee twice a day, westbound late morning and eastbound early afternoon.
San Francisco Zephyr ·
California Zephyr ·
this site's schedule log
1993
The railroad singles the summit: the original 1868 track over the top of the pass,
including the hand-cut Summit Tunnel, is taken out of service, and all traffic moves to the
1925 alignment through Tunnel 41. The abandoned tunnels become one of the Sierra's most
visited hikes.
Abandoned Rails, Donner Pass
2009
Union Pacific notches the crowns of fifteen tunnels between Rocklin and Truckee, more
than 18,000 feet of cutting, to clear double-stacked containers over Donner for the first
time. The change lets modern intermodal trains use the mountain route instead of detouring
around the Sierra.
Union Pacific release, Nov. 23, 2009
Today
The federal crossing record puts about fifteen through trains a day at Truckee, eight by
day and seven by night, including the two Zephyrs. The railroad publishes no schedule and no
tonnage figures for the pass. This site is building tools to measure what can be observed
from town.